Home Email Sitemap
 

Tuff Coat EP-101 Epoxy Paint
Tuff Coats PU-101 Enamel
Tuff Coat Stoving Enamel

Etch  Primer With Hardener
Peelable Clear Lacquer
Tuff Coat St-1 Stove Enamel
Texture / Structure Finish
Tuff Coat PU - 101 Clear Lacquer
Tuff Coats Epoxy Stoving Paint
Epoxy Zinc Rich Primer

Acrofast Primer Surfacer Zinc Phosphate
Lcf Wash Primer

Hb-285 Epoxy Surfacer / Intermediate Coat Znp
 

Tuff Coat EP-101 Epoxy Paint

 
INTRODUCTION
Tuff Coats PU-101 Enamel is the two component system, designed to cross link at room temperature. Base component is an acrylic polyurethane i.e. Hydroxyl Functional Acrylic copolymer (pigmented) which reacts with blocked polyisocynate adduct (Second component) to form tough film with outstanding durability, chemical & weather resistance. The system also gives excellent gloss and color retentions properties.
An effective Top Coat for petrochemical refinery and fertilizer industries. The system is useful for maintenance coating, structural coating as well as for floor coating. Because of rapid curing at room temperature and excellent toughness and abrasion resistance, resistance to heat, oil, Alcohols Acid & salty weather, the system gives wide range of application in Aircraft finishes, transport finishes and chemical industries.
KEY PROPERTIS OF SYSTEM :
 
Fast drying at room temperature It can withstand to the temperature around 100 D.C.
Weather Resistance 
Excellent colour & gloss retention
Alcohol Resistance  
Unaffected by splash and spillage
Salts   
Unaffected
 
Floor Coating Work In Progress
Floor Coating After Completion
 
Before application of Top-coat PU-101 Enamel do all necessary pretreatment of the job. For M.S.surface remove grease oil & other contamiation by using proper de-rusting & Phosphating chemicals to clean surface. Apply properly TUFF COAT PU-102 primer coat or Hi-Build wash primer. After proper drying of primer coat apply PU-101 Enamel. For old concrete remove salt deposition / fungal growth, loosely bound coatings, dust particles and make the surface rough. Also for new concrete do the needful pretreatment / priming and then apply Top-Coat PU-101 Enamel. Stir the base component thoroughly & mix four parts of base & one part of  hardener by volume to uniform consistency. Keep it for 15-30 min for stabilization & stir again before use. Make required viscosity as per application method with TC / PU 101 Thinner. Mix the above material as per requirement because of 4-5 hrs. Pot life ; close the containers immediately to avoid the chances of the moisture absorption in material. Do not apply in humid condition during the raining, fog or mist or at very low temperature i.e. bellow 7oC
 
 
Once the hardener container is opened ; try to consume it immediately because it reacts with Hydroxyl groups present in atmosphere & it results in to gelatin.